This project involves the demolition of the existing 8-storey Elizabeth McMaster Building and design of a new 22-storey Patient Support Centre. Project components include a new 452,000-sq. ft. shell and core office building (Class A), two levels of below-grade program space, clinical spaces, a conference centre, a new pedestrian bridge connecting the Peter Gilgan Centre for Research and Learning and the hospital’s main atrium, and the interior fit-out of approximately 460,000 sq. ft. This project will be designed to include a low carbon heat pump plant and a connection to the Enwave Deep Lake Water Cooling system. It will pursue LEED Gold certification. Our role includes plumbing, fire protection, HVAC, and building automation design; mechanical decommissioning of the existing building; and participation in the commissioning process for mechanical-related systems.
Size: 452,000 sq. ft.
Owner: SickKids Hospital
Architect: B+H Architects